Before conducting water supply management and overall testing on server cabinets, drain, dry, and inject nitrogen into the liquid cooling channels inside the cabinets. Can be used to drain, dry, and inject nitrogen into two cabinets and two nodes.
Contact Us

Product Details

Before conducting water supply management and overall testing on server cabinets, drain, dry, and inject nitrogen into the liquid cooling channels inside the cabinets. Can be used to drain, dry, and inject nitrogen into two cabinets and two nodes. The equipment integrates temperature, humidity, and pressure instruments for monitoring; Using a proportional control valve for pressure regulation to ensure stable gas supply; Equipped with a heater, it can regulate the gas temperature and achieve good drying efficiency; Internally integrated oil-free vacuum pump, with reliable performance and long service life.

 

 

Features:

 

 

  • Conduct testing on 2 cabinets or 2 nodes
  • Using electrical proportional valves for gas source control to ensure stable input nitrogen/air pressure
  • Adopting a heater for stepless speed regulation and high drying efficiency
  • SUS304 stainless steel pipeline has high pressure bearing capacity and high reliability
  • 21 inch display screen for easy data reading
  • Equipped with an alarm mechanism to assist operation and maintenance personnel in quickly and accurately locating system anomalies

 

 

Application:

 

 

  • Liquid cooling server node drainage, drying, and nitrogen injection
  • Drain, dry and inject nitrogen into the liquid cooling cabinet

 

 

 

 

Item

Parameters

System design parameters

Purging medium type

Compressed air

Drainage and intake pressure

≤0.7(Mpa)

Draining time

cabinet≤5min/cabinet    1min/node

Drying medium

Compressed hot air

Media filtration accuracy

0.01μm

Drying inlet temperature range

40-80℃

Heater power

≤4.5kW

Temperature regulation accuracy

+/-5℃

Drying time

≤30min/cabinet   ≤10min/node

Drying qualified humidity determination

28% RH(@40℃ relative humidity)

Drying pipeline interface form

Matching with cabinet interface

Nitrogen injection medium

Industrial pure nitrogen

Nitrogen injection pressure

30~60kPa

Nitrogen injection process time

≤10min/cabinet

Time for vacuum

Cabinet≤30min/cabinet    Node≤25min/node

System vacuum requirements

≤5pa

Vacuum gauge accuracy

1*10-1pa*10+4pa±20%

Independently control the number of channels

2 channels (2 cabinets or 2 nodes)

Design pressure (PSI/bar)*2

102/8

Test pressure (PSI/bar)

102/10

Weight (kg/lbs)

600/1323

Working environment temperature and humidity

-20~45℃/ RH5~85%

Storage environment temperature and humidity

-40~65℃/RH5~95%

Power interface

Aviation connector

Max. power consumption

≤5.5kW

Communication interfaces and quantity

RJ45/6

Modbus

Modbus TCP/IP

Interface specifications

Chuck/quick connect

Color

Pantone Cold Grey C11

External dimensions (height * width * depth)

1490x800x1400mm

 

 

 

 

Product Classification